Binh Thuan to adjust planning, investment, protection, and development of an ecosystem of Hung Vuong Park

13/09/2022, 15:32

BTO- Chairman of the provincial People’s Committee Le Tuan Phong chaired a meeting on Monday afternoon (September 12) to listen to a report on the adjustment plans for investing, protecting, and developing the ecosystem of Hung Vuong Park. The event had the participation of representatives of leaders of relevant departments, branches, and localities.

Accordingly, the province’s Project Management Board of the Civil and Industrial Construction presented their 3 options for the planning adjustment as a result of their coordination with consulting unit. Through analysis and evaluation of all 3 options, it can be recognized that option 1 is feasible because of its reasonable solutions with the most advantages in solving problems.

Based on the proposal of the consulting unit, the Project Management Board proposed the Provincial People's Committee consider the report to the Standing Provincial Party Committee for the policy of making adjustments to the detailed planning of project area 5 (Hung Vuong Park) according to to option 1 of the plan.

Particularly, Option 1 has a functional subdivision for the new development area which is a transitional space inside the wetland protection forest area. It can also be connected in terms of land use value for public land, commercial, and service areas on the opposite side outside the land boundary. The protected area is an existing natural tree area located inside bordering the Binh Loi River. The total area of the planning study area is more than 31 hectares.

This option’s strength is to form a multi-functional cultural park that is reflected in the land use planning solution. Moreover, the space can be developed based on the available things which take the ecosystem as the center for the orientation of space development and human activities. In addition, adaptive development was evaluated and incorporated into the design-build solution.

Chairman of the Provincial People's Committee Le Tuan Phong agreed with the proposal of the Project Management Board, requesting the unit to complete the plans, then report to the Standing Provincial Party Committee for consideration. However, Chairman Phong also noted that for option 1, it is necessary to calculate the expansion location in combination with the surrounding road to increase the area, forming a space to serve the needs of walking and stopping. At the same time, it should research to plant more appropriate trees. In particular, the proposed plans must pay attention to the treatment of water sources to ensure environmental sanitation in this area.

TRANSLATED BY MY THIEN

According to Bao Binh Thuan
Copy Link
Related articles
Efforts to complete 4 segments of the North-South Expressway in 120 days and nights
BTO – A launching ceremony of an emulation called “Taking 120 days and nights to implement 4 construction projects of Mai Son-National Highway 45, Cam Lo-La Son, Vinh Hao-Phan Thiet and Phan Thiet-Dau Giay” took place on September 10th at the construction site of 04-XL package deal (Ham Kiem commune, Ham Thuan Nam district). The event was held by the Ministry of Transport.

(0) Comments
Focus
Photo exhibition on “President Ho Chi Minh with the glorious victory of the nation” held in Binh Thuan
BTO - A photo exhibition “President Ho Chi Minh with the glorious victory of the nation” is being held to celebrate the 49th anniversary of the Liberation Day of Binh Thuan Homeland (April 19, 1975 - April 19, 2024), which is also linked to the 49th anniversary of the Liberation of the South, the reunification of the country (April 30, 1975 - April 30, 2024).
Do not miss
POWERED BY ONECMS - A PRODUCT OF NEKO
Binh Thuan to adjust planning, investment, protection, and development of an ecosystem of Hung Vuong Park